Case studyBasra, Iraq

SIBA Field Development Project – Iraq

Siba Field Development Project

Basra, Iraq

Table of contents

Sectors

  • Oil & Gas

Expertise

  • Electrical
  • Mechanical
  • HVAC

Capabilities

  • Engineering
  • Procurement
  • Construction

Clients

  • PETROJET

Project Name

Siba Field Development Project

Location

Basra, Iraq

Project Owner

Kuwait Energy

Project Consultant

Kuwait Energy

Description

The Siba gas field, located in northern Iraq and explored in 1968, spans approximately 21 km in length and 6-13 km in width, with reserves of 1.1 trillion cubic feet. Petrojet secured the contract to construct the initial gas-processing facility for the field, designed to boost production to 3.1 million cubic meters per day.

Awarded Scope

Argonaut was tasked with supplying, installing, testing, and commissioning all HVAC system components, including:

  • Air handling units and condensing units (9 units)
  • Air cooling condensing units (9 units)
  • Mini split high wall units (42 units)
  • Supply/exhaust air fans (axial flow type)
  • Air distribution system
  • Sheet metal works
  • Thermal insulation of sheet metal duct
  • Air outlets
  • Drainage system
  • HVAC electrical panel