Case studySeiyun, Yemen
Kharir Development Phase-I, Block 10 – BPU
Kharir Development Phase-I, Block 10 – BPU
Seiyun, Yemen
Table of contents
Sectors
- Oil & Gas
Expertise
- Electrical
- Mechanical
- HVAC
Capabilities
- Engineering
- Procurement
- Construction
Clients
- Total E&P - Yemen
- PETROJET
Project Name
Kharir Development Phase-I, Block 10 – BPU
Location
Seiyun, Yemen
Project Owner
Total E&P - Yemen
Main Contractor
Petrojet (Petroleum Projects and Technical Consultations Company)
Project Consultant
Enppi (Engineering for Petroleum and Process Industries)
Project Scope
Design, fabrication, supply, installation, testing, adjustment, balancing and warranty of HVAC systems including:
- Air-cooled condensing units (450kW+ cooling capacity)
- Air handling units (17,140 l/s supply flow, 450kW cooling capacity)
- Air cooled packaged units (7,480 l/s supply flow, 220kW cooling capacity)
- Condensing split units (6-70kW capacity range)
- Air handling split units (545-5,285 l/s flow range)
- Ductwork and air outlets
- Exhaust fans
- Terminal duct heaters
- Motor control center
- Automatic control system
- Pressurization system
- Battery room ventilation system
Industry Classification
Oil and Gas / Petrochemical Industries
“Recognition was given for Argonaut's valuable contributions and dedicated cooperation on mechanical and electrical work. The company completed their assigned tasks in a timely, quality manner during the construction, fabrication, and pre-commissioning phases of the Basement Process Unit (BPU) project, spanning December 2009 to October 2010.”